HSGFoundry Specialists
← 200mm Mature-Node

Tower Semiconductor

Migdal Haemek, Israel

Company Overview

Headquarters
Migdal Haemek, Israel
Ownership
Public (Nasdaq/TASE: TSEM); independent (2022 Intel acquisition terminated 2023)
Total Fabs
Six fabs: Fab 2 (Migdal Haemek, Israel), Fab 3 (Newport Beach, CA), Fab 5 (Tonami, Japan) and Fab 7 (Uozu, Japan) via TPSCo, Fab 9 (San Antonio, TX), Fab 10 (Agrate, Italy, 300mm). Fab 1 (150mm) ceased operations Q1 2025. TPSCo is 51% Tower / 49% Nuvoton Technology Japan; a March 2026 restructuring gives Tower 100% of Fab 7 and Nuvoton 100% of Fab 5, targeted to close April 2027
200mm Fab Locations
Fab 2 (Migdal Haemek, Israel), Fab 3 (Newport Beach, CA), Fab 9 (San Antonio, TX), Fab 5 (Tonami, Japan)
Wafer Sizes Run
200mm & 300mm
Most Recent Revenue
FY2025 revenue US$1,566.1M (+9% YoY); Q4 2025 US$440M (record, +14% YoY); Q1 2026 US$414M (+15% YoY)
Employees
5,316 as of Dec 31, 2025 (Japan 2,398; US 1,586; Israel 1,296; other 36)
Major Segments
RF infrastructure (SiPho/SiGe), high-voltage 200mm power management, sensors, new 300mm envelope trackers
Long-Term Strategy
Specialty analog/RF/photonics positioning; doubling then tripling silicon-photonics capacity through 2026; new 300mm Agrate facility adds cost in near term

Process Technologies

No named process technologies recorded for this foundry yet.

Absence here means the process list has not been researched, not that the foundry offers none.

Technology Portfolio

CMOS Min/Max Geometry
130nm-800nm on 200mm (Fab 2: 0.13-0.35um; Fab 3: 0.13-0.80um; Fab 9: 0.18-0.8um); 65nm on 300mm (TPSCo Japan and Fab 10 Agrate only)
CMOS Analog/RF/Mixed-Signal
Yes (strong RF)
CMOS Embedded Memory
Limited
CMOS HV, Automotive-Qualified
Yes
BCD Voltage Range
Yes
BCD LDMOS
Yes
BCD/SOI Isolation Option
Yes
SOI — PD-SOI
Yes
SOI — FD-SOI
No
SOI — RF-SOI
Yes (strong)
SOI — Photonics-Compatible
Yes (leading)
MEMS
Yes
Power — SiC
Limited
Power — GaN
Limited
Power — HV CMOS
Yes
Specialty — eNVM
Limited
Specialty — CIS
No
Specialty — Photonics
Yes (leading)
Specialty — Display Driver
No

Manufacturing Capability

Qualified 200mm Fabs
3 (Israel, Newport Beach, San Antonio) + Agrate (300mm)
Multi-Site Technology Transfer
Yes — explicit multi-fab qualification is a company selling point
Automotive Production Volume
Yes
IATF 16949
Yes (verify per fab)
ISO 13485 (Medical)
Yes — sensor/analog lines used in medical designs, verify per fab
ISO 9001
Yes
AS9100 (Aerospace)
Limited — verify
Defense / Rad-Hard Experience
Some — RF/defense-adjacent customers reported
Export Restriction Status
Not export-restricted; Israel-based site carries regional security risk, not trade-control risk

Capacity & Supply Chain

Typical Quoted Lead Time (200mm)
Verify — company emphasizes flexible, customer-specific lead times
Recent Utilization
Revenue growth trend suggests high utilization (record Q4 2025 revenue)
Expansion Plans
Doubling then tripling silicon-photonics capacity by mid-2026; new 300mm Agrate (Italy) facility ramping (adds near-term fixed-cost drag)
Geographic Redundancy
Good — Israel + 2 US sites + Italy
Single-Site Concentration Risk
Low-moderate — genuinely multi-region for a specialty player
Natural Disaster Exposure
Elevated in Israel (regional security risk) — low in US/Italy sites
Utility Risk (Power/Water)
Low — mature grids across all sites

Fabs & Geopolitical Risk

Fab SiteCountryUS Import TariffConsiderationsRisk
Fab 2 — Migdal HaemekIsraelNot recordedRegional security risk (Israel conflict exposure) is the primary factor, not US-China trade policyElevated
Newport Beach, CAUnited StatesNot recordedLow export-control friction; benefits from friendshoring demandLow
San Antonio, TXUnited StatesNot recordedSame low-risk US profile as Newport BeachLow
Fab 5 — Tonami (TPSCo, 200mm)JapanNot recordedHeld through TPSCo, 51% Tower / 49% Nuvoton Technology Japan. Under a March 2026 restructuring Nuvoton takes 100% of this 200mm fab (targeted close April 2027), so it is expected to leave Tower's portfolio.Low
Fab 7 — Uozu (TPSCo, 300mm)JapanNot recordedHeld through TPSCo. The same March 2026 restructuring gives Tower 100% ownership of this 300mm fab via a wholly owned Japanese subsidiary. Tower also announced a METI-supported expansion in July 2026 adding a new adjacent 300mm fab plus repurposing the former Arai facility.Low
Agrate (300mm, ST-operated; Tower holds rights to ~1/3 of capacity)Italy (EU)Not recordedEU Chips Act eligible; adds a second low-risk Western jurisdictionLow

Cost & Commercial

MPW Shuttle Availability
Yes — company markets itself as accessible to fabless/smaller customers via multiple regional design centers
Typical Mask Set Cost (Order of Magnitude)
Specialty analog/RF/photonics: mid-to-high six figures depending on process complexity
Prototype/Engineering Wafer Pricing
Not publicly listed — company known for engaging directly with smaller/startup customers
Production Wafer Pricing Direction (2025–26)
Growth trend suggests firming prices; record Q4 2025 revenue
Typical NRE Posture
More flexible than large digital foundries — frequently cited as approachable for fabless/startup engagement
Packaging/Test Partnerships
Multiple regional OSAT partnerships (US, Israel, Asia)
Licensing / IP Fees
Standard PDK/TLA licensing; active IP ecosystem for RF/photonics building blocks

Ecosystem

Cadence
Yes — Virtuoso certified for RF/analog/photonics flows
Synopsys
Yes — including OptoDesigner-class photonics flows
Siemens EDA (Calibre)
Yes — Calibre sign-off standard
Notable IP Vendor Relationships
Active RF/photonics IP-building-block ecosystem
OSAT / Packaging Partners
Multi-region OSAT partnerships (US, Israel, Asia)
Design-Service Partners
Known for direct engagement with fabless/startup design teams via regional design centers
University / Reference-Design Programs
Active participant in industry photonics consortia (verify current list)
Open-Source / Academic PDK
No public open PDK